Summit Roof Pros of OntarioCompare Ontario roofing quotes without the runaround.(909) 738-1199Free inspection

Ontario prices

Gutter replacement prices in Ontario, CA

The cheapest time to replace gutters is during a re-roof, because the crew and the staging are already there.

Or call (909) 738-1199

Get claim-ready quotes

Up to three local contractors, and never more.

Or call (909) 738-1199

Free · Up to three quotes

Get claim-ready quotes

Up to three local contractors, and never more.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Nothing is charged and nothing is booked.

Seamless aluminium gutter, per foot$12 – $27Most homes run 160 to 220 feet.
Ridge and intake ventilation upgrade$633 – $2,577The cheapest thing you can do to make the next roof last its full life.
Skylight replacement, each$1,286 – $3,606Cheaper done during a re-roof than on its own afterwards.

These are estimated ranges, not quotes. Compiled from public installed-cost data for California and adjusted for how Ontario is built. No contractor is bound by them, and nobody can price a roof they have not stood on.

Typical prices, Ontario, CA.
ItemTypical rangeNotes
Seamless aluminium gutter, per foot$12 – $27Most homes run 160 to 220 feet.
Ridge and intake ventilation upgrade$633 – $2,577The cheapest thing you can do to make the next roof last its full life.
Skylight replacement, each$1,286 – $3,606Cheaper done during a re-roof than on its own afterwards.

What moves the price

  • Permit and inspection fees, which vary more between towns than people expect
  • How many old layers have to come off before the new one goes on
  • The number of penetrations: chimneys, skylights, vents, solar mounts
  • Access — a truck that cannot get near the house adds hours to every load
  • Where you land in the season; crews discount when the phone is quiet

Locally

These winds are not constant, which is the problem. A roof gets nine quiet months and then one night at fifty miles an hour, and whatever was marginal goes.

Check the fascia before agreeing a price. Hanging new metal off soft wood is a year-long solution.

These are estimates, not quotes. They are compiled from national installed ranges adjusted for California costs and for how Ontario is built. No contractor is bound by them.

Questions about price

How long should a roof last here?

Rated life and real life are different numbers. Here, ordinary rated life is a fair guide, provided the attic breathes. Ventilation and the quality of the installation move that more than the brand does.

How many contractors will contact me?

No more than three. We picked that number because two quotes is not enough to spot an outlier and five is an ordeal.

Should I take the cheapest quote?

Not automatically. Put the quotes side by side on layers, not on totals — underlayment, ice-and-water, drip edge, valley treatment, ventilation, decking allowance, warranty. Cheap usually means less of those, not the same roof for less money.

What is it going to cost?

No cost, no obligation, and never more than three contractors.

(909) 738-1199Call nowFree inspection