Guide
When patching stops being worth it
A roof that needs replacing usually shows four or five separate small symptoms before it shows one large one.
Get it looked at
Three questions, and up to three Ontario contractors. Free either way.
You are on the list.
No provider in Ontario is taking requests through this service yet. We are lining them up, and yours is kept until one can.
- Nobody gets your details yet. Your request stays with us and is not passed to any company.
- One email when someone can help. When a provider covering your area can take it on, we email you once and ask whether you want that company, by name, to contact you.
- Deleted after 90 days. If nobody can take it on, or you do not say yes, your contact details are deleted 90 days after your request.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
Nobody will call you about this request unless you say yes to a company by name.
Repeated repairs in different places
When the leaks stop clustering and start appearing anywhere, you are not fixing a fault any more. You are paying for a replacement in instalments, at a worse rate.
Sagging along a line
A ridge or a plane that dips is a structural signal rather than a covering one. It usually means decking that has been wet long enough to lose strength, and occasionally framing. This is the one symptom that should not wait.
Granules in the gutter
Asphalt shingles are protected by a granular surface. When that surface starts washing off in quantity, the mat underneath is exposed to ultraviolet and the clock speeds up sharply. A handful of granules after a new roof is normal shedding. Cupfuls, years later, is not.
The age on the paperwork
If the roof is over twenty years old and made of asphalt, an inspection is worth doing whether or not it is leaking. The failure modes above are much cheaper to catch before the water arrives than after.
Shingles that curl, cup or go brittle
A roof near the end goes hard. Shingles that were pliable enough to seal down in the sun no longer bond, and the first serious wind takes them.
Daylight or damp in the attic
The attic tells the truth earlier than the ceiling does. Staining on the underside of the deck predates any stain you will see downstairs by a long way.
In short
If two or more of these apply, get somebody to look at it and give you a remaining-life number in years. That single number turns the decision from a worry into arithmetic.
Related questions
Do I need a permit?
Almost certainly, for a full replacement. The contractor should pull it, and the fee should be a visible line on the quote rather than a surprise.
What does a new roof cost in Ontario?
For a typical Ontario home of about 23 squares, an architectural asphalt re-roof usually lands between $11,500 and $28,000. Tile, slate and standing-seam metal run well above that. The number moves on how many old layers come off, how much decking is soft underneath, and how easily a truck can get to the house.
Is this really free?
It is free to you. Contractors pay to receive homeowner requests in their area. That is the entire business model, and we would rather say so plainly than pretend otherwise.
What is it going to cost?
Free, no obligation, and your details go to no company until you say yes.